top of page

Tech Report 1A

Lighting Proposal Memo

Tech Report 3

Lighting Schematic / Initial Design Development Presentation

Tech Report 1B

Lighting Existing Conditions and Design Criteria Report

Tech Report 2

Electrical Systems Existing Conditions

Final Presentation posted to CPEP

 

Final Report posted to CPEP

 

Spring Proposal posted to CPEP

 

Fall Proposal posted to CPEP

 

Tech Report 3: Lighting Schematic / Initial Design Development Presentation

Tech Report 2: Electrical Systems Existing Conditions

Abstract Posted on CPEP

Building Statistics Part 2: Posted on CPEP

 

Building Statistics Part 1: Posted on CPEP

Abstract Color and Content: Electronic Draft

Resume submitted for AE Career Fair listing

Resume and Portfolio Posted on CPEP

Tech Report 1B: Lighting Existing Conditions and Design Criteria Report

Building Statistics Part 1: Electronic Draft

Student Bio Sketch posted on CPEP

 
Tech Report 1A: Lighting Proposal Memo
 
CPEP Home Page Draft
Attended CPEP Seminar

Confirmed and/or Corrected Master List Information

Turned in Project Initiation Checklist Part 2

Turned in Project Initiation Checklist Part 1

Obtained Project Documentation (drawings, specs, etc.)

Mailed AE Dept. Thank You Letters to primary contacts

Sent personal note, letter or email to your contacts to thank those who helped you obtain the building or other project information (include owner)

Owner Permission Received

bottom of page