top of page
Final Presentation posted to CPEP
Final Report posted to CPEP
Spring Proposal posted to CPEP
Fall Proposal posted to CPEP
Tech Report 3: Lighting Schematic / Initial Design Development Presentation
Tech Report 2: Electrical Systems Existing Conditions
Abstract Posted on CPEP
Building Statistics Part 2: Posted on CPEP
Building Statistics Part 1: Posted on CPEP
Abstract Color and Content: Electronic Draft
Resume submitted for AE Career Fair listing
Resume and Portfolio Posted on CPEP
Tech Report 1B: Lighting Existing Conditions and Design Criteria Report
Building Statistics Part 1: Electronic Draft
Student Bio Sketch posted on CPEP
Tech Report 1A: Lighting Proposal Memo
CPEP Home Page Draft
Attended CPEP Seminar
Confirmed and/or Corrected Master List Information
Turned in Project Initiation Checklist Part 2
Turned in Project Initiation Checklist Part 1
Obtained Project Documentation (drawings, specs, etc.)
Mailed AE Dept. Thank You Letters to primary contacts
Sent personal note, letter or email to your contacts to thank those who helped you obtain the building or other project information (include owner)
Owner Permission Received
bottom of page