top of page
Capture.PNG

Final Presentation posted to CPEP

 

Final Report posted to CPEP

 

Spring Proposal posted to CPEP

 

Fall Proposal posted to CPEP

 

Tech Report 3: Lighting Schematic / Initial Design Development Presentation

​

Tech Report 2: Electrical Systems Existing Conditions

​

Abstract Posted on CPEP

​

Building Statistics Part 2: Posted on CPEP

 

Building Statistics Part 1: Posted on CPEP

​

Abstract Color and Content: Electronic Draft

​

Resume submitted for AE Career Fair listing

​

Resume and Portfolio Posted on CPEP

​

Tech Report 1B: Lighting Existing Conditions and Design Criteria Report

​

Building Statistics Part 1: Electronic Draft

​

Student Bio Sketch posted on CPEP

 
Tech Report 1A: Lighting Proposal Memo
 
CPEP Home Page Draft
​
Attended CPEP Seminar
​

Confirmed and/or Corrected Master List Information

​

Turned in Project Initiation Checklist Part 2

​

Turned in Project Initiation Checklist Part 1

​

Obtained Project Documentation (drawings, specs, etc.)

​

Mailed AE Dept. Thank You Letters to primary contacts

​

Sent personal note, letter or email to your contacts to thank those who helped you obtain the building or other project information (include owner)

​

Owner Permission Received

​

  • Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Ari DiMaria. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

bottom of page